Ongoing vs. completed passive actions (buvo remontuojamas vs. buvo suremontuotas)

Ongoing process vs. completed result in the past: buvo -mas vs. buvo -tas

In the past and future passive, Lithuanian separates an ongoing process (something was being done) from a completed result (something was done / finished). The difference lies in which passive participle follows buvo (was / were) or bus (will be):

  • Ongoing process (buvo
    • -mas, -ma, -mi, -mos)
    : the present passive participle, usually from an unprefixed (imperfective) verb such as remontuoti (to repair → remontuojamas) or keisti (to change, replace → keičiamas). It presents the action as in progress over a period of time.
  • Completed result (buvo
    • -tas, -ta, -ti, -tos)
    : the past passive participle, usually from a prefixed (perfective) verb such as suremontuoti (to finish repairing → suremontuotas) or pakeisti (to replace completely → pakeistas). It states that the action was completed.

Both participles agree with the subject in gender and number. In the singular:

  • Masculine singular (-mas vs. -tas): tiltas (bridge), ruožas (stretch, section of road; kelio ruožas).
  • Feminine singular (-ma vs. -ta): sankryža (intersection), danga (surface, pavement; kelio danga, gatvės danga).

Time expressions highlight the contrast:

  • Duration of an ongoing process is expressed with the accusative and no preposition: visą vasarą (all summer), visą rudenį (all autumn).
  • Time taken to complete an action is expressed with per + accusative (in, within): per mėnesį (in a month), per tris savaites (in three weeks), per kelias dienas (within a few days).

To set an ongoing action and a completed action side by side in one sentence, join the two clauses with o (whereas, while, and).

The bridge was being repaired all summer, whereas the intersection was repaired in a month.
Tiltas buvo remontuojamas visą vasarą, o sankryža buvo suremontuota per mėnesį.
Fortunately, that dangerous stretch of road was repaired in three weeks.
Laimei, tas pavojingas kelio ruožas buvo suremontuotas per tris savaites.
On this stretch, the road surface was being replaced all autumn.
Šiame ruože kelio danga buvo keičiama visą rudenį.
The old street surface was replaced within a few days.
Sena gatvės danga buvo pakeista per kelias dienas.

Road and tunnel projects: plural agreement (-mi vs. -ti) and future processes

Useful verb pairs and nouns for building infrastructure:

  • tiesti (to lay a road, path, or sidewalk; ongoing: tiesiamas, tiesiami) vs. nutiesti (to finish laying; completed: nutiestas, nutiesti).
  • statyti (to build; ongoing: statomas) vs. pastatyti (to finish building; completed: pastatytas), used for structures like tunelis (tunnel). The plural-only noun metai (years) takes the collective numeral, so duration in the accusative is trejus metus (for three years).
  • vykdyti (to carry out, conduct; ongoing: vykdomas, vykdomi), often used with plural nouns such as statybos darbai (construction work) and remonto darbai (repair work).

For plural subjects, the participle endings are:

  • Masculine plural: -mi (ongoing: nauji dviračių takai bus tiesiami, darbai buvo vykdomi) vs. -ti (completed: buvo nutiesti nauji keliai).
  • Feminine plural: -mos (ongoing) vs. -tos (completed).

With bus instead of buvo, an ongoing participle describes a process that will be underway in the future (visą pavasarį 'all spring', iki kada 'until when').

Last year, a new road was being laid past our village.
Pernai pro mūsų kaimą buvo tiesiamas naujas kelias.
A wide sidewalk along the river was laid in one month.
Platus šaligatvis palei upę buvo nutiestas per vieną mėnesį.
The long tunnel under the mountain was being built for three years.
Ilgas tunelis po kalnu buvo statomas trejus metus.
When the tunnel was built, new roads were laid nearby.
Kai tunelis buvo pastatytas, šalia buvo nutiesti nauji keliai.
All spring, new bicycle paths will be laid in this district.
Visą pavasarį šiame rajone bus tiesiami nauji dviračių takai.
Construction work was being carried out here for a long time, more precisely, for half a year.
Statybos darbai čia buvo vykdomi ilgai, tiksliau sakant, pusę metų.
Rūta would like to find out until when repair work will be carried out in the center.
Rūta norėtų sužinoti, iki kada centre bus vykdomi remonto darbai.

Planning, approvals, and announcements: bus -mas vs. bus -tas

In the future tense, bus combines with both participle types:

  • Future ongoing process (bus
    • -mas, -ma, -mi, -mos)
    : an activity that will continue over a span of time or happen regularly (visą savaitę 'all week', iki penktadienio 'until Friday', kasdien 'daily').
  • Future completed result (bus
    • -tas, -ta, -ti, -tos)
    : a single step or outcome that will be finished at a specific time (penktadienį 'on Friday', pirmadienį 'on Monday', rytoj 'tomorrow').

Useful verbs for city planning, approvals, and traffic reports:

  • derinti (to coordinate, align; ongoing: derinamas). It takes su
    • instrumental, e.g. su savivaldybe 'with the municipality'.
  • priimti (to accept; to make a decision): this verb already has a prefix, so the same verb supplies both the ongoing participle (paraiškos bus priimamos 'applications will be accepted', feminine plural -mos) and the completed participle (sprendimas bus priimtas 'the decision will be made').
  • tvirtinti (to approve, confirm; ongoing: tvirtinamas, tvirtinama) vs. patvirtinti (to finalize approval; completed: patvirtintas). Use kol pagaliau (until finally) to link a long process to its completion.
  • skelbti (to announce, publish; ongoing: skelbiama, skelbiami) vs. paskelbti (to announce or publish as a completed result: paskelbtas).
  • užbaigti (to finish, complete; completed: užbaigtas).
The bridge renovation plan was being coordinated with the municipality for several weeks.
Tilto atnaujinimo planas buvo derinamas su savivaldybe kelias savaites.
The project will be coordinated all week, and the contract will be signed on Friday.
Projektas bus derinamas visą savaitę, o sutartis bus pasirašyta penktadienį.
Applications will be accepted until Friday, and the decision will be made on Monday.
Paraiškos bus priimamos iki penktadienio, o sprendimas bus priimtas pirmadienį.
The budget was being approved for three weeks until it was finally approved.
Biudžetas buvo tvirtinamas tris savaites, kol pagaliau buvo patvirtintas.
Announcements about the repair will be published daily, and the final schedule will be published tomorrow.
Pranešimai apie remontą bus skelbiami kasdien, o galutinis tvarkaraštis bus paskelbtas rytoj.
Mr. Tomas, could you say when the repair of this tunnel will be finished?
Pone Tomai, ar galėtumėte pasakyti, kada bus užbaigtas šio tunelio remontas?
Passive typeStructure & endings (m. sg. / f. sg. / m. pl. / f. pl.)Typical time expressionsExample
Past ongoingbuvo + -mas, -ma, -mi, -mosvisą vasarą, kelias savaites, trejus metusTiltas buvo remontuojamas visą vasarą.
Past completedbuvo + -tas, -ta, -ti, -tosper mėnesį, per kelias dienas, kol pagaliauSankryža buvo suremontuota per mėnesį.
Future ongoingbus + -mas, -ma, -mi, -mosvisą savaitę, iki penktadienio, kasdienParaiškos bus priimamos iki penktadienio.
Future completedbus + -tas, -ta, -ti, -tospenktadienį, pirmadienį, rytoj, kadaSprendimas bus priimtas pirmadienį.

Contributors